8th March, 2018. Litter (continued).
The picture above was taken at a point along the Humber Estuary foreshore at the seaward side of the clay bank flood defence. It was an attempt to show how littered the high tide point is, many more plastic bottles and other items were visible than were captured in this photo. The recent spring tides […]
8th March, 2018. Litter (continued). Read More »